Bathrooms

The whole bathroom

Furniture, fittings, towel warmers and walls from one design, on the plan of your bathroom.

Travertine-look slabs, walnut vanity and shower arriving in the bathroom

The point

A bathroom works when basin, shower and slabs were thought out together

When they come from three suppliers something never lines up: a height, a joint, a connection. We start from the plan.

What we bring

From vanity to towel warmer

  1. 01

    Vanities and basins

    Wall-hung or floor-standing units in wood, lacquer or veneer, with basins in ceramic, stone or resin.

    • Wall-hung or floor
    • Stone basins
    Vanities and basins
  2. 02

    Showers and trays

    Flush-to-floor trays, frameless glass screens, columns and rain heads.

    • Flush to floor
    • Frameless glass
    Showers and trays
  3. 03

    Sanitaryware and taps

    Wall-hung sanitaryware, concealed taps and matching finishes, from chrome to brushed bronze.

    • Wall-hung
    • Matching finishes
    Sanitaryware and taps
  4. 04

    Slabs and walls

    Large-format porcelain in stone and marble looks, with veining that runs from one slab into the next.

    • Large format
    • Continuous veining
    Slabs and walls
  5. 05

    Towel warmers

    Electric or hydronic towel radiators in the same finish as the taps.

    • Electric or hydronic
    Towel warmers

On the plan

Draw it first, then order

Every piece has its place and its height before it reaches site, so the plumber knows where the connections go.

  1. 01Walls and door
  2. 02Wall slabs
  3. 03Vanity and basin
  4. 04Flush shower
  5. 05Sanitaryware
  6. 06Towel warmer
240 cm180 cm VanityShowerWCWarmer
Example bathroom 240 × 180 cm.

How we work

From plan to keys

  1. 01

    Survey

    Measurements, drains, connections: everything already there.

  2. 02

    Design

    The plan with pieces and heights, agreed together.

  3. 03

    Written quote

    Every piece with its code, delivery times and fitting.

  4. 04

    Delivery and fitting

    One delivery to site, followed by us.

Questions

What people ask us

Can the walls be redone without removing the tiles?

Often yes, with thin slabs bonded over the existing tiling. We assess it at the survey.

How long does a full bathroom take?

It depends on the pieces: stock items arrive in three or four weeks, made-to-measure in six to eight. It is written in the quote.

Will you work with my plumber?

Yes. We give them the plan with connection heights before they start.

The other lines

The rest of the house

Start from the plan

Send us measurements or a photo: we draw the first layout.